Robin Rigg Wind Farm, Scotland's first offshore wind farm, was constructed by E.ON at Robin Rigg in the Solway Firth, a sandbank midway between the Galloway and Cumbrian coasts. The windfarm first generated power for test purposes on 9 September 2009. The wind farm was completed on 20 April 2010.
CCL UK were contracted in to perform the Fibre Optic Terminations and Testing on the Inter Array Cable systems.