These two projects comprised of a total of 54 3.6 Mw turbines and now is situated three miles off the coast of Skegness. The Inner Dowsing project was completed in 2008 and the Lynn section has now been completed. CCL were the principle optic fibre contractor for termination, jointing and testing for all shore link and Array subsea cables. This was to be one of the largest offshore Wind Farm in the world. Once fully operational it was capable of supplying power to more than 130 homes.